What Is Included
- ARB covenant review for the specific Katy community section, including both master and village-level deed restrictions
- Complete ARB submission documentation: spec sheets, color reference, pile height, fiber tip treatment, coverage percentage diagram
- Front-yard installation scope addressing easement strip, driveway transition, and shaded zone conditions
- Rear-yard grade verification against builder pad elevation before base system design
- Base preparation calibrated to drainage tributary area and clay soil drainage behavior
- Seam placement planning for ARB street-view composition requirements
- Post-installation ARB compliance photo documentation support
