What Is Included
- Tier-appropriate scope development: residential sport court, HOA community park field, or school/institutional athletic surface
- Base engineering for athletic-grade compaction and aggregate gradation supporting heel-strike and pivot loads
- Drainage system design for field-recovery-within-hours performance in Fort Bend County clay soil
- Cushioning system and fiber specification against applicable safety and shock attenuation standards
- HOA and school district scope and specification documentation for board evaluation and approval
- Phased installation planning to minimize disruption to existing athletic facility calendar
- Post-installation performance verification against specified shock attenuation and drainage recovery standards
