What Is Included
- Rear-yard drainage amendment base system sized for pet waste volume beyond natural clay drainage capacity
- Antimicrobial-treated infill installed to manufacturer-specified depth with depth documentation in post-installation record
- Seam placement mapped away from predictable high-stress dog run paths
- HOA rear-yard setback verification before rear-edge positioning
- Fiber face weight specification appropriate for concentrated launch and run-path stress conditions
- Drainage system engineering for Gulf Coast high-heat, high-humidity, concentrated-use environment
- Pet zone and family entertainment zone integration in unified installation footprint
